Wall prep · skim · paint
Hong Kong is humid — paint isn't just colour, it's your wall's protection layer. We commit to a full 7-step process, no shortcuts.
Paint types & where to use them
Easy to clean, low odour, dries fast. Top brands: Nippon, Dulux, Benjamin Moore.
Contains anti-mould agents; resists mildew spots for 5+ years.
Zero VOC, zero formaldehyde, highly breathable — higher price point.
Hard finish, smooth surface, resists scratches and repeated cleaning.
Stucco, Venetian, rammed-earth effects — requires master craftsmanship.
Sealer coat. Skipping primer cuts the lifespan in half.
HK humidity · moisture-proofing essentials
- 1. Strip peeling old paint down to the skim layer — never patch spots only, or the new paint will peel off with the old.
- 2. Skim 2–3 times, letting each layer fully dry and sanding smooth in between.
- 3. Apply a moisture-block or anti-mould primer to seal the wall's moisture pathways.
- 4. At least two topcoats — light sand after the first before the second.
- 5. Pause painting when humidity > 85% (spring/rainy season) to avoid blushing.
Standard process & timeline
- 01Protect furniture & floors, seal doors/windows (½ day)
- 02Strip old paint, remove mould stains (1–2 days)
- 03Skim & patch, 2–3 passes (2–3 days, wall-dependent)
- 04Full sanding & dust extraction (½–1 day)
- 05Moisture-block primer, 1 coat (½ day)
- 06Topcoat, 2 coats (1–2 days)
- 07Edge trim inspection & handover walk-through
A whole-flat repaint typically takes 4–7 working days, depending on area and wall condition.
From prep & skim to final coat — every layer, visible.
Real painting sites across HK homes and shops — including moisture-proofing, feature walls, ceiling refresh and bare-shell skim coating.









